Google certainly has more compute density than Amazon, the numbers I was able to find from the local power company was 250MW at Council Bluffs back in 2015 or so.
Amazon builds out 32MW shells, and the most utilized as of 5 or 6 years ago was 24MW or so, with most being much less than that.
Amazon builds out 32MW shells, and the most utilized as of 5 or 6 years ago was 24MW or so, with most being much less than that.